Home Skip to main content

Project Details

Title:Grand Forks Continuing Traffic Data Collection Support
Principal Investigators:Kshitij Sharma
End Date:September 2021
Status:Completed

Abstract

Recent reconstruction of the Grand Forks transportation network included upgrades of some of the older models of cameras. The MPO intended to: 1) continue utilizing the reconstructed intersections for traffic data collection; 2) utilize available API commands to download traffic data; and 3) minimize data loss and disruptions
As part of this study, 9 intersections with 36 cameras were to be configured/re-configured to collect traffic volumes and speeds.

Project Deliverables

NDSU Dept 2880P.O. Box 6050Fargo, ND 58108-6050
(701)231-7767ndsu.ugpti@ndsu.edu