Project Details
Title: | US 85 / ND 200 Spot Speed Studies |
Principal Investigators: | Kshitij Sharma |
End Date: | August 2021 |
Status: | Completed |
Abstract
NDDOT requested the Advanced Traffic Analysis Center (ATAC) to conduct before-and-after spot speed studies at three locations along US 85/ND 200. One study was conducted at each of the locations with both northbound/westbound and southbound/eastbound directions of travel observed. Two years later, another study was conducted in the same manner.
Project Deliverables