Date |
Description |
10.03.2014 | 203-010 SHRINKAGE: ___ percent additional volume is included for shrinkage in earth embankment. |
03.22.2022 | 203-360 COMPACTION AND DENSITY CONTROL: Compact material as specified in Section 203.04 G.2.b, "ND T-99".
Manipulate embankment material with disking equipment.
Use on projects that will require ND T-99 compaction when required by the Material and Research Soils Report. NOTE has been Revised for the 2022 Standard Specification. |
10.03.2014 | 203-380 AVERAGE HAUL: The average haul shown on the plans does not include the dead haul from the borrow areas to the point of entry into the mass. |
10.03.2014 | 203-385 AVERAGE HAUL: No average haul has been computed for this project. |