Standard Notes (Design)
|
Date | Description |
---|---|
08.02.2016 | 108-100 WEEKLY PLANNING & REPORTING MEETING: A weekly planning and reporting meeting is required. (This note is intended for use on projects where a weekly meeting is required. The Specifications require the Engineer in the field to provide a list of invitees to the Contractor at the Pre-Construction Meeting. A discussion on the list of attendees should take place at the PS&E.) |
08.12.2016 | 108-150 PUBLIC RELATIONS COORDINATOR: Provide a public relations and information coordinator. The coordinator cannot be the project superintendent or construction foreman. The coordinator should be knowledgeable in construction operations, be able to develop effective media releases, possess written and verbal communication skills, and be able to organize productive meetings. Provide the name, work address, and work phone number to the relevant project, community, and media personnel. The public relations coordinator is responsible for providing the following:
|
10.31.2016 | 108-500 TERO COORDINATION: Invite the Tribal TERO Office to the Preconstruction Conference. (Use this note when working on any of the reservations.) |
Standard Notes (Design):
- Section 100
- Section 200
- Section 300
- Section 400
- Section 500
- Section 600
- Section 700
- Section 800
- Section 900
Download Template
The following template can be used for standard and plan notes.
- Design Notes (DOCM, 70K)