Standard Notes (Design)
|
Date | Description |
---|---|
09.24.2014 | 107-100 LAWS TO BE OBSERVED: All or a portion of this project lies within the exterior boundaries of an Indian Reservation. Review laws and ordinances pertaining to the work contained within the boundaries of the reservation. |
08.26.2015 | 107-111 RAILROAD PROTECTIVE LIABILITY INSURANCE: This project crosses the Dakota, Missouri Valley & Western Railroad Company at RP ______. The type of work that will be performed within the railroad right of way is _________________. Direct inquiries regarding protective liability insurance to: JEFF WOOD Executive Vice President Dakota, Missouri Valley & Western Railroad, Inc. 3501 East Rosser Avenue Bismarck, ND 58501 701-223-9282 off. jwood@dmvwrr.com Obtain information regarding crossing number ___________ from the Federal Railroad Administration website: http://safetydata.fra.dot.gov/Officeofsafety/ Use this note when crossing the Dakota, Missouri Valley & Western Railroad. (You will need to contact the Planning division to obtain the RP number and the crossing number. Examples of types of work: Paving, Seal Coat, Striping, Earthwork, Base Work, etc.) |
09.06.2023 | 107-112 RAILROAD PROTECTIVE LIABILITY INSURANCE: This project crosses the Canadian Pacific Kansas City Railway at RP ______. The type of work that will be performed within the railroad right of way is _________________. Direct inquiries regarding protective liability insurance to: BRIAN OSBORNE Manager Public Works Canadian Pacific Kansas City Railroad 120 South 6th Street, Suite 700, Minneapolis, MN 55402 612-330-4555 off. brian_osborne@cpkcr.ca Obtain information regarding crossing number ___________ from the Federal Railroad Administration website: http://safetydata.fra.dot.gov/Officeofsafety/ Use this note when crossing the Canadian Pacific Kansas City Railroad. (You will need to contact the Planning division to obtain the RP number and the crossing number. Examples of types of work: Paving, Seal Coat, Striping, Earthwork, Base Work, etc.) |
12.07.2022 | 107-113 RAILROAD PROTECTIVE LIABILITY INSURANCE: This project crosses the Northern Plains Railroad at RP ______. The type of work that will be performed within the railroad right of way is _________________. Direct inquiries regarding protective liability insurance to: Jesse Chalich President Northern Plains Railroad P.O. Box 38 Fordville, ND 58231 701-229-3444 off. jesse_chalich@nprail.com Obtain information regarding crossing number ___________ from the Federal Railroad Administration website: http://safetydata.fra.dot.gov/Officeofsafety/ Use this note when crossing the Northern Plains Railroad. (You will need to contact the Planning division to obtain the RP number and the crossing number. Examples of types of work: Paving, Seal Coat, Striping, Earthwork, Base Work, etc.) |
12.07.2022 | 107-114 RAILROAD PROTECTIVE LIABILITY INSURANCE: This project crosses the Red River Valley and Western Railroad Company at MP ______. The type of work that will be performed within the railroad right of way is _________________. Direct inquiries regarding railroad protective liability insurance to: Kristin Nicholson VP of Finance & Administration Red River Valley and Western Railroad P.O. Box 608 Wahpeton, ND 58074 701-642-8257 off. kristin.nicholson@rrvw.net Obtain information regarding crossing number ___________ from the Federal Railroad Administration website: http://safetydata.fra.dot.gov/Officeofsafety/ Use this note when crossing the Red River Valley and Western Railroad. (You will need to contact the Planning division to obtain the MP number and the crossing number. Examples of types of work: Paving, Seal Coat, Striping, Earthwork, Base Work, etc.) |
12.15.2015 | 107-115 RAILROAD PROTECTIVE LIABILITY INSURANCE: This project crosses the BNSF Railway Company at RP ______. The type of work that will be performed within the railroad right of way is _________________. Direct inquiries regarding protective liability insurance to: Rosa Martinez Marsh USA Inc. 4400 Comerica Bank Tower 1717 Main Street Dallas, TX 75201-7357, USA 214-303-8519 Rosa.M.Martinez@marsh.com Obtain information regarding crossing number ___________ from the Federal Railroad Administration website: http://safetydata.fra.dot.gov/Officeofsafety/ Use this note when crossing the Burlington Northern Santa Fe Railroad. (You will need to contact the Planning division to obtain the RP number and the crossing number. Examples of types of work: Paving, Seal Coat, Striping, Earthwork, Base Work, etc.) |
01.02.2018 | 107-300 CONSTRUCTION TRAFFIC ACCESS: Access areas within the right of way only at interchanges. The Engineer may allow temporary access at other locations. To obtain temporary access, provide an access plan containing the following information:
Note to be used for Interstate projects. |
10.09.2014 | 107-310 CONSTRUCTION TRAFFIC MEDIAN CROSSOVERS: During daylight hours, material may be hauled over the roadway used by public traffic. If the Contractor intends to perform this action, the following conditions must be met:
All work necessary to construct and maintain crossovers, provide traffic control, and to restore the area to its pre-existing condition must be completed at no additional cost to the Department. Note is for use on divided highways. |
09.26.2014 | 107-500 PAVEMENT SWEEPING: Sweep the roadway adjacent to the construction area at the end of each day. Utilize a vacuum or pickup type sweeper. |
09.26.2014 | 107-900 THREE AFFILIATED TRIBES BIA COORDINATION: Coordinate work on lands held in trust by the Bureau of Indian Affairs (BIA), allotted and tribally owned trust land, through the Environmental/Compliance Officer. Contact: Jeff Desjarlais Environmental/Compliance Officer, Ft. Berthold (701) 627-4707, ext. 244 Coordinate work regarding materials sources, staging areas, office locations, and other activities that are not expressly detailed in the contract documents. Note to be used on all projects that include work on the Fort Berthold Reservation. |
Standard Notes (Design):
- Section 100
- Section 200
- Section 300
- Section 400
- Section 500
- Section 600
- Section 700
- Section 800
- Section 900
Download Template
The following template can be used for standard and plan notes.
- Design Notes (DOCM, 70K)